CDV SYSTEMS' MINI MICRO-MEETING

MANAGING RM TEMPLATES FOR A NEW SUPER-HOSPITAL

20180521 GOTOMEETING_02B.jpg

SEE HOW 500+ ROOM TEMPLATES WERE CREATED, BATCH LOADED & MANAGED ACROSS 10,000+ ROOMS OF CANNON DESIGN'S NEW 3.5 MILLION SF HOSPITAL. this PRESENTATION includes A LIVE DEMONSTRATION OF THIS WORKFLOW.

BATCH LOADING ROOM TEMPLATES…      ...INTO ROOMS ACROSS THE PROJECT.

 
20180521 GOTOMEETING_01.jpg
 
_CHUM IMAGES_13.jpg

LET US SHOW YOU HOW WE DID IT.

If you would like to see this presentation, fill out the form below and we will get back to you shortly.


TOPICS TO INCLUDE: 

-      Creating a Library of Templates

-      Assigning to Project Program

-      Batch Loading Revit families (225 rooms per day per user)

-      Refinement of room layouts

-      Validation and reporting of completed rooms

-      Iteration after design changes

 

Description

80% of the 14,000 rooms of this new 3.5 million SQ hospital had an assigned CodeBook Room Type.

500+ library template room types included:

room data requirements (architectural, finishes, electrical and mechanical)

door requirements (sizes, observation, fire rating etc.)

fixtures, furniture and equipment list and layouts

CodeBook library room type was mapped to a Revit room and parameters populated

Equipment batch was inserted into the Revit project model rooms using the individual room type layouts defined in the library.

Equipment families were moved, rotated & adjusted as per the needs of each project room using Revit.

After CodeBook library room types were modified as design refined, those changes were auto-updated to Revit, compared and validated.

Reports were generated from CodeBook listing all discrepancies between the required room type values vs. those in the Revit model.    